Light gauge steel with lightweight concrete technology
22 may
Final stage. Removing an extra level.
To do lightweight screed you need to do next steps:1. Divide your room into sections.
2. Area of each section depends on thickness and capacity of your mixer.
3. Mixing a dry mix with water and additives.
4. Pour lightweight concrete as a liquid into the separated area.
5. Wait for 2-3 hours for curing time.
6. Remove extra level.
Next day your lightweight screed hard enough to walk on it.