Light gauge steel homes projects

Fast track construction technology. Suitable for residential and commercial projects

Cold formed steel structure with lightweight aerated concrete cladding and infill will provide you a number of advantages such as: shorter schedules are desirable for reasons that vary with building stakeholders but on reducing a time-to-market, meeting demand sooner or on time, decrease the cost of construction financing, the impact of inflation during construction, faster return on investment, and reduce overhead costs for the design and construction organizations

Get LGS Frame Cost Estimate

Send your drawings (PDF/DWG) and we’ll calculate steel quantity, frame cost, and timeline for UAE projects.

  • ✅ Based on UAE steel rates & engineering standards
  • ✅ Villa / Warehouse / Commercial projects
  • ✅ Fast reply on WhatsApp
Call: +971 56 896 8934 Email drawings: info@pioner-group.com
Tip: Add drawings or a quick sketch — we’ll reply faster.

Gallery: